Montrose
BrownfieldClinton, Henry, Missouri · Evergy Metro
Montrose is a coal plant in Clinton, Henry, Missouri, retired 2018-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 564 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Montrose, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN121362 | Substation-Adjacent | MO | Henry County | 161 kV | 100 MW | 1.4 yrs | 67.8 |
| UNKNOWN117681 | Substation-Adjacent | MO | Cass County | 161 kV | 100 MW | 1.4 yrs | 67.8 |
| UNKNOWN121416 | Substation-Adjacent | MO | Johnson County | 161 kV | 100 MW | 1.4 yrs | 66.4 |
| UNKNOWN121298 | Substation-Adjacent | MO | Johnson County | 161 kV | 100 MW | 1.4 yrs | 65.9 |
| UNKNOWN121417 | Substation-Adjacent | MO | Johnson County | 161 kV | 100 MW | 1.4 yrs | 65.8 |
| UNKNOWN117542 | Substation-Adjacent | MO | Henry County | 161 kV | 100 MW | 1.4 yrs | 65.8 |
| UNKNOWN121629 | Substation-Adjacent | MO | Bates County | 161 kV | 100 MW | 1.4 yrs | 65.6 |
| UNKNOWN117450 | Substation-Adjacent | MO | Johnson County | 161 kV | 100 MW | 1.4 yrs | 65.1 |
See all datacenter sites in Missouri →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Montrose, Clinton, Henry, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.