Montrose

Brownfield

Clinton, Henry, Missouri · Evergy Metro

Legacy capacity
564
MW

Montrose is a coal plant in Clinton, Henry, Missouri, retired 2018-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 564 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity564 MW
Retirement date2018-12-01
EIA plant ID#2080

Grid hookup & remediation

Nearest substation2.8 mi
OperatorEvergy Metro
Operator address400 SW Hwy P, Clinton, MO, 64735
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Montrose, ranked by DC Readiness.

Candidate sites near Montrose
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121362Substation-AdjacentMOHenry County161 kV100 MW1.4 yrs67.8
UNKNOWN117681Substation-AdjacentMOCass County161 kV100 MW1.4 yrs67.8
UNKNOWN121416Substation-AdjacentMOJohnson County161 kV100 MW1.4 yrs66.4
UNKNOWN121298Substation-AdjacentMOJohnson County161 kV100 MW1.4 yrs65.9
UNKNOWN121417Substation-AdjacentMOJohnson County161 kV100 MW1.4 yrs65.8
UNKNOWN117542Substation-AdjacentMOHenry County161 kV100 MW1.4 yrs65.8
UNKNOWN121629Substation-AdjacentMOBates County161 kV100 MW1.4 yrs65.6
UNKNOWN117450Substation-AdjacentMOJohnson County161 kV100 MW1.4 yrs65.1

See all datacenter sites in Missouri

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.