Kansas City International

Brownfield

Kansas City, Platte, Missouri · Evergy Missouri West

Legacy capacity
36
MW

Kansas City International is a natural gas plant in Kansas City, Platte, Missouri, retired 2020-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 36 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity36 MW
Retirement date2020-12-01
EIA plant ID#6144

Grid hookup & remediation

Nearest substation0.9 mi
OperatorEvergy Missouri West
Operator address9900 NW 112th St, Kansas City, MO, 64079
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Kansas City International, ranked by DC Readiness.

Candidate sites near Kansas City International
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN118616Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs73.3
TAP138882Substation-AdjacentMOClay County161 kV100 MW1.4 yrs73.0
HAWTHORNESubstation-AdjacentMOJackson County345 kV600 MW1.4 yrs72.9
UNKNOWN117461Substation-AdjacentMOPlatte County161 kV100 MW3.5 yrs72.6
IATANSubstation-AdjacentMOPlatte County345 kV600 MW3.5 yrs72.3
UNKNOWN117393Substation-AdjacentMOPlatte County161 kV100 MW3.5 yrs72.1
UNKNOWN117111Substation-AdjacentMOJackson County161 kV100 MW1.4 yrs72.0
UNKNOWN118111Substation-AdjacentKSWyandotte County161 kV100 MW3.5 yrs72.0

Nearby internet exchanges

See all datacenter sites in Missouri

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Kansas City International, Kansas City, Platte, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.