Paulding
BrownfieldPaulding, Jasper, Mississippi · Cooperative Energy
Paulding is a oil plant in Paulding, Jasper, Mississippi, retired 2017-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 20 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Paulding, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SWEATT | Substation-Adjacent | MS | Clarke County | 230 kV | 300 MW | 1.4 yrs | 69.5 |
| SWEATT | Substation-Adjacent | MS | Lauderdale County | 230 kV | 300 MW | 1.4 yrs | 69.0 |
| UNKNOWN109405 | Substation-Adjacent | MS | Wayne County | 230 kV | 300 MW | 1.4 yrs | 68.5 |
| UNKNOWN109551 | Substation-Adjacent | MS | Jones County | 230 kV | 300 MW | 1.4 yrs | 67.6 |
| UNKNOWN169512 | Substation-Adjacent | MS | Wayne County | 115 kV | 100 MW | 1.4 yrs | 65.9 |
| UNKNOWN109550 | Substation-Adjacent | MS | Lauderdale County | 115 kV | 100 MW | 1.4 yrs | 65.7 |
| UNKNOWN169458 | Substation-Adjacent | MS | Jones County | 115 kV | 100 MW | 1.4 yrs | 65.5 |
| UNKNOWN109611 | Substation-Adjacent | MS | Jones County | 230 kV | 300 MW | 1.4 yrs | 65.4 |
See all datacenter sites in Mississippi →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Paulding, Paulding, Jasper, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.