Benndale

Brownfield

Benndale, George, Mississippi · Cooperative Energy

Legacy capacity
16
MW

Benndale is a natural gas plant in Benndale, George, Mississippi, retired 2018-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity16 MW
Retirement date2018-03-01
EIA plant ID#2068

Grid hookup & remediation

Nearest substation1.1 mi
OperatorCooperative Energy
Operator address133 Clark-Mizelle Road, Benndale, MS, 39452
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Benndale, ranked by DC Readiness.

Candidate sites near Benndale
SiteTypeStateCountyVoltageCapacityQueue waitScore
DANIEL STATIONSubstation-AdjacentMSJackson County500 kV1,000 MW1.4 yrs73.8
BENNDALE 230Substation-AdjacentMSGeorge County230 kV300 MW1.4 yrs69.0
Greenfield (MC KNIGHT - DANIEL STATION)GreenfieldMSHarrison County500 kV1,000 MW1.4 yrs67.7
UNKNOWN110319Substation-AdjacentMSJackson County230 kV300 MW1.4 yrs66.9
TAP169444Substation-AdjacentMSGeorge County115 kV100 MW1.4 yrs66.3
UNKNOWN110245Substation-AdjacentMSPerry County161 kV100 MW1.4 yrs66.1
Greenfield (MC KNIGHT - DANIEL STATION)GreenfieldMSHarrison County500 kV1,000 MW1.4 yrs65.4
TAP141968Substation-AdjacentMSHarrison County115 kV100 MW1.4 yrs65.3

See all datacenter sites in Mississippi

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Benndale, Benndale, George, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.