Taconite Harbor Energy Center

Brownfield

Schroeder, Cook, Minnesota · ALLETE, Inc.

Legacy capacity
252
MW

Taconite Harbor Energy Center is a coal plant in Schroeder, Cook, Minnesota, retired 2023-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 252 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity252 MW
Retirement date2023-03-01
EIA plant ID#10075

Grid hookup & remediation

Nearest substation0.0 mi
OperatorALLETE, Inc.
Operator address8124 W. HWY 61, Schroeder, MN, 55613
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Cook County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)1,858
Construction employment130
Land value$7,495/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Load growth (FERC-714)0.7%

Water & cooling

Water stressLow
Public water supply0.3 MGD
Industrial water use0.0 MGD
Cooling degree days600
Mean annual temp42°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers1 · 96% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Taconite Harbor Energy Center

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Taconite Harbor Energy Center, ranked by DC Readiness.

Candidate sites near Taconite Harbor Energy Center
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129254Substation-AdjacentMNLake County138 kV100 MW2.8 yrs59.5
TAP134721Substation-AdjacentMNLake County115 kV100 MW2.8 yrs57.0
OZ LakeGreenfieldMNLake——1.4 yrs56.5
TAP134625Substation-AdjacentMNLake County115 kV100 MW2.8 yrs56.4
UNKNOWN129253Substation-AdjacentMNLake County115 kV100 MW2.8 yrs56.3
UNKNOWN130694Substation-AdjacentMNLake County69 kV50 MW2.8 yrs54.1
EC Near Taconite Harbor Energy CenterGreenfieldMNCook——1.4 yrs53.4
TAP134623Substation-AdjacentMNCook County69 kV50 MW2.8 yrs53.4

See all datacenter sites in Minnesota →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Taconite Harbor Energy Center, Schroeder, Cook, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.