Sleepy Eye

Brownfield

Sleepy Eye, Brown, Minnesota · Sleepy Eye Public Utility Comm

Legacy capacity
2
MW

Sleepy Eye is a oil plant in Sleepy Eye, Brown, Minnesota, retired 2010-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2010-06-01
EIA plant ID#2011

Grid hookup & remediation

Nearest substation17.0 mi
OperatorSleepy Eye Public Utility Comm
Operator address130 2nd Ave NW, Sleepy Eye, MN, 56085
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Sleepy Eye, ranked by DC Readiness.

Candidate sites near Sleepy Eye
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (HELENA - CEDAR MOUNTAIN)GreenfieldMNSibley County345 kV600 MW1.4 yrs69.1
Greenfield (HELENA - CEDAR MOUNTAIN)GreenfieldMNSibley County345 kV600 MW1.4 yrs67.7
TAP158842Substation-AdjacentMNRedwood County115 kV100 MW1.4 yrs67.6
Greenfield (UNKNOWN132584 - WILMARTH)GreenfieldMNBlue Earth County345 kV600 MW1.4 yrs67.3
Greenfield (HELENA - CEDAR MOUNTAIN)GreenfieldMNSibley County345 kV600 MW1.4 yrs67.3
UNKNOWN158262Substation-AdjacentMNRenville County115 kV100 MW1.4 yrs67.3
UNKNOWN129725Substation-AdjacentMNNicollet County115 kV100 MW1.4 yrs67.1
Greenfield (LYON COUNTY - CEDAR MOUNTAIN)GreenfieldMNBrown County345 kV600 MW1.4 yrs67.1

See all datacenter sites in Minnesota

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sleepy Eye, Sleepy Eye, Brown, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.