Seneca Community Solar Garden

Brownfield

Eagan, Minnesota

Legacy capacity
1
MW

Seneca Community Solar Garden is a former landfill site in Eagan, Minnesota. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer landfill site
Site typeepa_brownfield
Existing capacity1 MW
Acreage7 ac

Grid hookup & remediation

Nearest substation1.2 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former landfill site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Seneca Community Solar Garden, ranked by DC Readiness.

Candidate sites near Seneca Community Solar Garden
SiteTypeStateCountyVoltageCapacityQueue waitScore
PARKERS LAKESubstation-AdjacentMNHennepin County345 kV600 MW2.8 yrs71.6
EDEN PRAIRIESubstation-AdjacentMNHennepin County345 kV600 MW2.8 yrs71.6
BLUE LAKESubstation-AdjacentMNScott County345 kV600 MW2.8 yrs71.4
TERMINALSubstation-AdjacentMNRamsey County345 kV600 MW2.8 yrs71.2
UNKNOWN129614Substation-AdjacentMNHennepin County345 kV600 MW2.8 yrs70.3
UNKNOWN129414Substation-AdjacentMNAnoka County345 kV600 MW2.8 yrs70.2
KOHLMAN LAKESubstation-AdjacentMNRamsey County345 kV600 MW2.8 yrs69.5
MAXWELLSubstation-AdjacentMNRamsey County345 kV600 MW2.8 yrs69.4

Nearby internet exchanges

See all datacenter sites in Minnesota

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Seneca Community Solar Garden, Eagan, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.