Hutchinson Plant #2

Brownfield

Hutchinson, McLeod, Minnesota · Hutchinson Utilities Comm

Legacy capacity
25
MW

Hutchinson Plant #2 is a natural gas plant in Hutchinson, McLeod, Minnesota, retired 1999-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 25 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity25 MW
Retirement date1999-01-01
EIA plant ID#6358

Grid hookup & remediation

Nearest substation0.0 mi
Operator address1100 Industrial Blvd., Hutchinson, MN, 55350
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — McLeod County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)13,938
Construction employment467
Land value$7,217/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate11.72¢/kWh
Industrial power rate9.41¢/kWh
Load growth (FERC-714)0.7%

Water & cooling

Water stressLow
Public water supply2.7 MGD
Industrial water use1.8 MGD
Cooling degree days600
Mean annual temp42°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers11 · 57% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Hutchinson Plant #2 — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Hutchinson Plant #1natural gas plant361.0 mi—
Glencoeoil plant112.4 mi—
Hutchinson Landfillformer landfill site01.4 micleanup_complete

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Hutchinson Plant #2

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Hutchinson Plant #2, ranked by DC Readiness.

Candidate sites near Hutchinson Plant #2
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ MeekerGreenfieldMNMeeker——1.4 yrs61.2
UNKNOWN129735Substation-AdjacentMNMcLeod County230 kV300 MW2.8 yrs61.2
EC Near GlencoeGreenfieldMNMcLeod——1.4 yrs61.2
EC Near GlencoeGreenfieldMNMcLeod——1.4 yrs60.5
Hutchinson LandfillBrownfieldMNMcLeod69 kV0 MW2.8 yrs59.7
EC Near Hutchinson Plant #1GreenfieldMNMcLeod——1.4 yrs59.3
EC Near GlencoeGreenfieldMNMcLeod——1.4 yrs59.2
EC Near GlencoeGreenfieldMNMcLeod——1.4 yrs59.1

Nearby internet exchanges

See all datacenter sites in Minnesota →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Hutchinson Plant #2, Hutchinson, McLeod, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.