Skip to content
Gridcensus

Green Machine

Brownfield

Ft. George G. Meade, Anne Arundel, Maryland · Bloom Energy

Legacy capacity
2
MW

Green Machine is a natural gas plant in Ft. George G. Meade, Anne Arundel, Maryland, retired 2016-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2016-09-01
EIA plant ID#59282

Grid hookup & remediation

Nearest substation0.3 mi
OperatorBloom Energy
Operator address9800 Savage Rd, Ft. George G. Meade, MD, 20755
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Anne Arundel County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)228,083
IT / tech employment302
Construction employment19,312
Land value$12,289/acre
Datacenter tax incentiveproperty_tax_credits

Power economics & interconnection

Commercial power rate9.84¢/kWh
Industrial power rate8.89¢/kWh
Load growth (FERC-714)0.8%

Water & cooling

Water stressLow
Public water supply39.5 MGD
Industrial water use0.7 MGD
Cooling degree days1,300
Mean annual temp55°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers11 · 96% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Green Machine — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Riverside (MD)natural gas plant25716.4 mi—
Notch Cliffnatural gas plant14425.8 mi—
Herbert A Wagnercoal plant13614.0 mi—
Westportnatural gas plant12213.3 mi—
Gould Streetnatural gas plant10414.1 mi—
NIH Cogeneration Facilitynatural gas plant2218.9 mi—
Annapolis Renewable Energy Parkformer landfill site1717.2 micleanup_complete
Domino Sugar Baltimorenatural gas plant314.8 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Green Machine

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Green Machine, ranked by DC Readiness.

Candidate sites near Green Machine
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAUGH CHAPELSubstation-AdjacentMDAnne Arundel County500 kV1,000 MW3.8 yrs67.8
BURCHES HILLSubstation-AdjacentMDPrince George's County500 kV1,000 MW3.8 yrs67.1
BRIGHTONSubstation-AdjacentMDHoward County500 kV1,000 MW3.8 yrs67.0
BENNING (230KV)Substation-AdjacentDCDistrict of Columbia230 kV300 MW3.8 yrs65.4
BUZZARD POINTSubstation-AdjacentDCDistrict of Columbia230 kV300 MW3.8 yrs65.4
TOKOMASubstation-AdjacentMDDistrict of Columbia230 kV300 MW3.8 yrs65.1
UNKNOWN123195Substation-AdjacentMDBaltimore city230 kV300 MW3.8 yrs65.0
TAP139314Substation-AdjacentVAAlexandria city230 kV300 MW3.8 yrs64.8

Nearby internet exchanges

See all datacenter sites in Maryland →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Green Machine, Ft. George G. Meade, Anne Arundel, Maryland. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.