Green Machine
BrownfieldFt. George G. Meade, Anne Arundel, Maryland · Bloom Energy
Green Machine is a natural gas plant in Ft. George G. Meade, Anne Arundel, Maryland, retired 2016-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Green Machine, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN162181 | Substation-Adjacent | MD | Prince George's County | 500 kV | 1,000 MW | 3.1 yrs | 78.3 |
| WAUGH CHAPEL | Substation-Adjacent | MD | Anne Arundel County | 500 kV | 1,000 MW | 3.1 yrs | 77.7 |
| SANDY SPRING | Substation-Adjacent | MD | Howard County | 230 kV | 300 MW | 3.1 yrs | 75.8 |
| TAP139321 | Substation-Adjacent | MD | Montgomery County | 500 kV | 1,000 MW | 3.1 yrs | 75.6 |
| BUZZARD POINT | Substation-Adjacent | DC | District of Columbia | 230 kV | 300 MW | 3.1 yrs | 75.5 |
| POTOMAC RIVER | Substation-Adjacent | VA | Alexandria city | 230 kV | 300 MW | 3.1 yrs | 75.0 |
| SOUTH CARLYLE | Substation-Adjacent | VA | Alexandria city | 230 kV | 300 MW | 3.1 yrs | 74.8 |
| POTOMAC YARD | Substation-Adjacent | VA | Alexandria city | 230 kV | 300 MW | 3.1 yrs | 74.8 |
Nearby internet exchanges
- CoreSite - Reston (VA1)Reston, VA · 79 networks
- CoreSite - Reston (VA2)Reston, VA · 20 networks
- CoreSite - Washington,DC (DC1)Washington, DC · 16 networks
- Level(3) McLeanMcLean, VA · 9 networks
See all datacenter sites in Maryland →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.