Waterside GT

Brownfield

Louisville, Jefferson, Kentucky · Louisville Gas & Electric Co

Legacy capacity
45
MW

Waterside GT is a natural gas plant in Louisville, Jefferson, Kentucky, retired 2006-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 45 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity45 MW
Retirement date2006-08-01
EIA plant ID#1367

Grid hookup & remediation

Nearest substation0.1 mi
OperatorLouisville Gas & Electric Co
Operator address233 West Washinigton Stree, Louisville, KY, 40202
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Waterside GT, ranked by DC Readiness.

Candidate sites near Waterside GT
SiteTypeStateCountyVoltageCapacityQueue waitScore
CANE RUNSubstation-AdjacentINFloyd County345 kV600 MW3.0 yrs74.0
CANE RUN SWITCHINGSubstation-AdjacentKYJefferson County345 kV600 MW3.0 yrs73.3
TAP139013Substation-AdjacentINHarrison County345 kV600 MW3.0 yrs72.9
MIDDLETOWN 345 KVSubstation-AdjacentKYJefferson County345 kV600 MW3.0 yrs72.8
MILL CREEK STATIONSubstation-AdjacentKYJefferson County345 kV600 MW3.0 yrs72.3
NORTHSIDESubstation-AdjacentINClark County345 kV600 MW3.0 yrs71.9
HARDINSubstation-AdjacentINFloyd County345 kV600 MW3.0 yrs71.8
SPEEDSubstation-AdjacentINClark County345 kV600 MW3.0 yrs71.7

Nearby internet exchanges

See all datacenter sites in Kentucky

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Waterside GT, Louisville, Jefferson, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.