Pineville
BrownfieldFour Mile, Bell, Kentucky · Kentucky Utilities Co
Pineville is a coal plant in Four Mile, Bell, Kentucky, retired 2002-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 38 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Bell County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Pineville
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Pineville, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP153133 | Substation-Adjacent | TN | Claiborne County | 161 kV | 100 MW | 1.0 yrs | 64.3 |
| TAZEWELL | Substation-Adjacent | TN | Claiborne County | 161 kV | 100 MW | 1.0 yrs | 64.2 |
| OZ Claiborne | Greenfield | TN | Claiborne | — | — | 3.7 yrs | 63.4 |
| PINEVILLE | Substation-Adjacent | KY | Bell County | 500 kV | 1,000 MW | 3.8 yrs | 63.2 |
| CEDAR GROVE | Substation-Adjacent | TN | Claiborne County | 161 kV | 100 MW | 1.0 yrs | 63.1 |
| EC Coal Claiborne County | Greenfield | TN | Claiborne County | — | — | 3.7 yrs | 62.8 |
| JELLICO | Substation-Adjacent | TN | Whitley County | 161 kV | 100 MW | 1.0 yrs | 61.3 |
| LAFOLLETTE | Substation-Adjacent | TN | Campbell County | 161 kV | 100 MW | 1.0 yrs | 61.2 |
See all datacenter sites in Kentucky →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.