Tecumseh Energy Center
BrownfieldTecumseh, Shawnee, Kansas · Evergy Kansas Central, Inc
Tecumseh Energy Center is a coal plant in Tecumseh, Shawnee, Kansas, retired 2018-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 290 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Tecumseh Energy Center, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OZ Douglas | Greenfield | KS | Douglas | — | — | 3.5 yrs | 62.0 |
| EC Coal Douglas County | Greenfield | KS | Douglas County | — | — | 3.5 yrs | 61.6 |
| EC Near Baldwin City Plant No 1 | Greenfield | KS | Douglas | — | — | 3.5 yrs | 61.2 |
| EC Coal Douglas County | Greenfield | KS | Douglas County | — | — | 3.5 yrs | 61.2 |
| EC Near Lawrence Energy Center | Greenfield | KS | Douglas | — | — | 3.5 yrs | 60.8 |
| EC Near Lawrence Energy Center | Greenfield | KS | Douglas | — | — | 3.5 yrs | 60.7 |
| EC Near Lawrence Energy Center | Greenfield | KS | Douglas | — | — | 3.5 yrs | 60.5 |
| EC Near Ottawa | Greenfield | KS | Franklin | — | — | 3.5 yrs | 60.3 |
See all datacenter sites in Kansas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.