Osawatomie

Brownfield

Miami, Miami, Kansas · Evergy Metro

Legacy capacity
639
MW

Osawatomie is a natural gas plant in Miami, Miami, Kansas. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 639 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity639 MW
EIA plant ID#7928

Grid hookup & remediation

Nearest substation0.0 mi
OperatorEvergy Metro
Operator address32808 Lone Star Road, Miami, KS, 66071
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Osawatomie, ranked by DC Readiness.

Candidate sites near Osawatomie
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117601Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs75.9
WEST GARDNERSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs73.6
STILWELLSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs72.6
UNKNOWN117492Substation-AdjacentMOJackson County161 kV100 MW3.5 yrs71.4
UNKNOWN118165Substation-AdjacentKSJohnson County161 kV100 MW3.5 yrs71.3
UNKNOWN121757Substation-AdjacentMOCass County161 kV100 MW1.4 yrs71.1
QUARRYSubstation-AdjacentKSJohnson County161 kV100 MW3.5 yrs70.9
UNKNOWN118141Substation-AdjacentKSJohnson County161 kV100 MW3.5 yrs70.8

Nearby internet exchanges

See all datacenter sites in Kansas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.