Sugar Creek Power

Brownfield

West Terre Haute, Vigo, Indiana · Northern Indiana Pub Serv Co

Legacy capacity
509
MW

Sugar Creek Power is a natural gas plant in West Terre Haute, Vigo, Indiana. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 509 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity509 MW
EIA plant ID#55364

Grid hookup & remediation

Nearest substation0.1 mi
Operator address5900 Darwin Rd., West Terre Haute, IN, 47885
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Vigo County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)38,636
Construction employment2,118
Land value$5,886/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate10.99¢/kWh
Industrial power rate8.65¢/kWh
Load growth (FERC-714)0.9%

Water & cooling

Water stressLow
Public water supply12.2 MGD
Industrial water use1.6 MGD
Cooling degree days1,000
Mean annual temp52°F

Hazard, flood & connectivity

FEMA risk index32.0 · Relatively Moderate
Fiber providers7 · 81% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Sugar Creek Power — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Wabash Rivercoal plant86810.5 mi—
Wabash Valley Power IGCCoil plant11310.5 mi—
Marshall (IL)oil plant19.3 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Sugar Creek Power

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Sugar Creek Power, ranked by DC Readiness.

Candidate sites near Sugar Creek Power
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN124618Substation-AdjacentINVigo County345 kV600 MW3.8 yrs66.6
SULLIVANSubstation-AdjacentINSullivan County765 kV1,000 MW3.8 yrs64.5
UNKNOWN124442Substation-AdjacentINVigo County230 kV300 MW3.8 yrs62.8
UNKNOWN124759Substation-AdjacentINVigo County345 kV600 MW3.8 yrs62.6
MEROM STATIONSubstation-AdjacentINSullivan County345 kV600 MW3.8 yrs62.0
BREEDSubstation-AdjacentINSullivan County345 kV600 MW3.8 yrs62.0
OZ EdgarGreenfieldILEdgar——4.6 yrs61.4
UNKNOWN124449Substation-AdjacentINVigo County230 kV300 MW3.8 yrs61.0

See all datacenter sites in Indiana →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Sugar Creek Power, West Terre Haute, Vigo, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.