F B Culley

Brownfield

Newburgh, Warrick, Indiana · Southern Indiana Gas & Elec Co

Legacy capacity
46
MW

F B Culley is a coal plant in Newburgh, Warrick, Indiana, retired 2006-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 46 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity46 MW
Retirement date2006-12-01
EIA plant ID#1012

Grid hookup & remediation

Nearest substation0.3 mi
OperatorSouthern Indiana Gas & Elec Co
Operator address3700 Darlington Road, Newburgh, IN, 47630
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near F B Culley, ranked by DC Readiness.

Candidate sites near F B Culley
SiteTypeStateCountyVoltageCapacityQueue waitScore
JEFFERSONSubstation-AdjacentINSpencer County765 kV1,000 MW4.6 yrs75.6
UNKNOWN123186Substation-AdjacentKYHenderson County345 kV600 MW4.6 yrs75.1
A B BrownBrownfieldINPosey530 MW74.4
HMP&L Station Two HendersonBrownfieldKYWebster405 MW74.4
ELMER SMITHSubstation-AdjacentKYDaviess County345 kV600 MW4.6 yrs74.2
UNKNOWN127880Substation-AdjacentINVanderburgh County138 kV100 MW4.6 yrs73.2
NORTHEASTSubstation-AdjacentINVanderburgh County138 kV100 MW4.6 yrs72.8
DAVIESS COUNTYSubstation-AdjacentKYDaviess County345 kV600 MW4.6 yrs72.2

Nearby internet exchanges

See all datacenter sites in Indiana

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.