Crane Naval is a former landfill site in Crane, Indiana. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 17 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Crane Naval, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OZ Monroe | Greenfield | IN | Monroe | — | — | 3.0 yrs | 63.2 |
| PETERSBURG STATION | Substation-Adjacent | IN | Pike County | 345 kV | 600 MW | 3.8 yrs | 62.0 |
| OZ Monroe | Greenfield | IN | Monroe | — | — | 3.0 yrs | 61.7 |
| BLOOMINGTON ROGERS ST | Substation-Adjacent | IN | Monroe County | 138 kV | 100 MW | 3.8 yrs | 61.7 |
| TAP139950 | Substation-Adjacent | IN | Monroe County | 138 kV | 100 MW | 3.8 yrs | 60.7 |
| BEDFORD (345KV) | Substation-Adjacent | IN | Lawrence County | 345 kV | 600 MW | 3.8 yrs | 60.6 |
| UNKNOWN124851 | Substation-Adjacent | IN | Monroe County | 138 kV | 100 MW | 3.8 yrs | 60.6 |
| BLOOMINGTON ROCKPORT | Substation-Adjacent | IN | Monroe County | 138 kV | 100 MW | 3.8 yrs | 60.4 |
Nearby internet exchanges
- Indiana University Data CenterBloomington, IN · 0 networks
See all datacenter sites in Indiana →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Crane Naval, Crane, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.