2 AC Station

Brownfield

East Chicago, Lake, Indiana · Cleveland Cliffs

Legacy capacity
82
MW

2 AC Station is a natural gas plant in East Chicago, Lake, Indiana, retired 2009-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 82 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity82 MW
Retirement date2009-04-01
EIA plant ID#10211

Grid hookup & remediation

Nearest substation0.0 mi
Operator address3210, East Chicago, IN, 46312
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Lake County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)167,551
IT / tech employment29
Construction employment11,141
Land value$7,916/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate16.78¢/kWh
Industrial power rate6.44¢/kWh
Load growth (FERC-714)0.9%

Water & cooling

Water stressLow
Public water supply76.0 MGD
Industrial water use1178.7 MGD
Cooling degree days1,000
Mean annual temp52°F

Hazard, flood & connectivity

FEMA risk index32.0 · Relatively Moderate
Fiber providers9 · 40% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near 2 AC Station — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Crawfordcoal plant80518.4 mi—
Baillycoal plant64116.7 mi—
Dean H Mitchellcoal plant5382.5 mi—
Southeast Chicago Energy Projectnatural gas plant4076.4 mi—
Fisk Streetcoal plant37416.9 mi—
Calumetnatural gas plant2786.2 mi—
4 AC Stationcoal plant1351.5 mi—
Gary Worksnatural gas plant706.6 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track 2 AC Station

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near 2 AC Station, ranked by DC Readiness.

Candidate sites near 2 AC Station
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN122269Substation-AdjacentILCook County345 kV600 MW3.8 yrs71.4
UNKNOWN124436Substation-AdjacentILCook County345 kV600 MW3.8 yrs70.4
UNKNOWN122285Substation-AdjacentILCook County345 kV600 MW3.8 yrs68.7
UNKNOWN124699Substation-AdjacentILCook County345 kV600 MW3.8 yrs67.1
BURNHAMSubstation-AdjacentILLake County345 kV600 MW3.8 yrs66.1
UNKNOWN122289Substation-AdjacentILCook County345 kV600 MW3.8 yrs66.1
BLUE ISLANDSubstation-AdjacentILCook County345 kV600 MW3.8 yrs66.1
BEDFORD PARKSubstation-AdjacentILCook County345 kV600 MW3.8 yrs66.1

Nearby internet exchanges

See all datacenter sites in Indiana →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for 2 AC Station, East Chicago, Lake, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.