Lockport Powerhouse

Brownfield

Lockport, Will, Illinois · Metro Wtr Recl Dist Grtr Chi

Legacy capacity
16
MW

Lockport Powerhouse is a former hydro site in Lockport, Will, Illinois, retired 1950-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity16 MW
Retirement date1950-01-01
EIA plant ID#10903

Grid hookup & remediation

Nearest substation0.6 mi
OperatorMetro Wtr Recl Dist Grtr Chi
Operator address2400 S. Powerhouse Road, Lockport, IL, 60441
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Lockport Powerhouse, ranked by DC Readiness.

Candidate sites near Lockport Powerhouse
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLANO (765 KV)Substation-AdjacentILKendall County765 kV1,000 MW4.6 yrs78.7
UNKNOWN124436Substation-AdjacentILCook County345 kV600 MW2.2 yrs78.0
UNKNOWN122269Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.8
TAP160103Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.6
PLANO (345 KV)Substation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.4
ITASCASubstation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.4
ELMHURSTSubstation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.2
ELECTRIC LIGHT 345 KVSubstation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.2

Nearby internet exchanges

See all datacenter sites in Illinois

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Lockport Powerhouse, Lockport, Will, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.