Springfield, Sangamon, Illinois · City of Springfield - (IL)

Legacy capacity
75
MW

Lakeside is a coal plant in Springfield, Sangamon, Illinois, retired 2009-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 75 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity75 MW
Retirement date2009-10-01
EIA plant ID#964

Grid hookup & remediation

Nearest substation0.1 mi
OperatorCity of Springfield - (IL)
Operator address3100 Stevenson Drive, Springfield, IL, 62703
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Lakeside, ranked by DC Readiness.

Candidate sites near Lakeside
SiteTypeStateCountyVoltageCapacityQueue waitScore
AUSTINSubstation-AdjacentILSangamon County345 kV600 MW4.6 yrs69.6
KINCAID STATIONSubstation-AdjacentILChristian County345 kV600 MW4.6 yrs69.4
PAWNEESubstation-AdjacentILSangamon County345 kV600 MW4.6 yrs69.2
TAP138261Substation-AdjacentILMacon County345 kV600 MW4.6 yrs68.4
UNKNOWN122516Substation-AdjacentILChristian County138 kV100 MW4.6 yrs66.9
LakesideBrownfieldILSangamon75 MW66.3
UNKNOWN123103Substation-AdjacentILLogan County138 kV100 MW4.6 yrs66.2
TAP139416Substation-AdjacentILSangamon County138 kV100 MW4.6 yrs65.9

See all datacenter sites in Illinois

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Lakeside, Springfield, Sangamon, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.