Galesburg, Knox, Illinois · Archer Daniels Midland Co

Legacy capacity
3
MW

Galesburg is a natural gas plant in Galesburg, Knox, Illinois, retired 2012-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity3 MW
Retirement date2012-01-01
EIA plant ID#54310

Grid hookup & remediation

Nearest substation1.6 mi
Operator address1021 South Henderson, Galesburg, IL, 61401
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Knox County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)13,641
Construction employment511
Land value$8,642/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate9.27¢/kWh
Industrial power rate3.85¢/kWh
Load growth (FERC-714)0.7%

Water & cooling

Water stressLow
Public water supply0.5 MGD
Industrial water use0.0 MGD
Cooling degree days1,100
Mean annual temp52°F

Hazard, flood & connectivity

FEMA risk index35.0 · Relatively High
Fiber providers11 · 84% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Galesburg

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Galesburg, ranked by DC Readiness.

Candidate sites near Galesburg
SiteTypeStateCountyVoltageCapacityQueue waitScore
SANDBURGSubstation-AdjacentILKnox County345 kV600 MW3.8 yrs64.9
EC Coal Fulton CountyGreenfieldILFulton County——4.6 yrs62.4
EC Coal Fulton CountyGreenfieldILFulton County——4.6 yrs62.3
EC Coal Knox CountyGreenfieldILKnox County——4.6 yrs60.8
EC Coal Fulton CountyGreenfieldILFulton County——4.6 yrs60.4
EC Near GalesburgGreenfieldILKnox——4.6 yrs59.8
UNKNOWN122601Substation-AdjacentILFulton County138 kV100 MW3.8 yrs59.7
EC Near GalesburgGreenfieldILKnox——4.6 yrs59.7

See all datacenter sites in Illinois →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Galesburg, Galesburg, Knox, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.