Archer Daniels Midland Peoria

Brownfield

Peoria, Peoria, Illinois · BioUrja Renewables LLC

Legacy capacity
46
MW

Archer Daniels Midland Peoria is a natural gas plant in Peoria, Peoria, Illinois, retired 2017-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 46 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity46 MW
Retirement date2017-12-01
EIA plant ID#10866

Grid hookup & remediation

Nearest substation0.6 mi
OperatorBioUrja Renewables LLC
Operator address1 Edmund Street, Peoria, IL, 61602
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Archer Daniels Midland Peoria, ranked by DC Readiness.

Candidate sites near Archer Daniels Midland Peoria
SiteTypeStateCountyVoltageCapacityQueue waitScore
FARGO 345 KVSubstation-AdjacentILPeoria County345 kV600 MW1.4 yrs76.1
RISER159738Substation-AdjacentILTazewell County345 kV600 MW4.6 yrs75.8
IPAVASubstation-AdjacentILFulton County345 kV600 MW1.4 yrs74.6
DEADEND167139Substation-AdjacentILTazewell County345 kV600 MW4.6 yrs73.9
TAZEWELLSubstation-AdjacentILTazewell County345 kV600 MW4.6 yrs73.7
RISER159739Substation-AdjacentILTazewell County345 kV600 MW4.6 yrs72.7
UNKNOWN123092Substation-AdjacentILPeoria County138 kV100 MW4.6 yrs72.0
UNKNOWN122930Substation-AdjacentILTazewell County138 kV100 MW4.6 yrs71.4

Nearby internet exchanges

See all datacenter sites in Illinois

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen