Legacy capacity
2
MW

Thousand Springs is a former hydro site in Wendell, Gooding, Idaho, retired 2017-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity2 MW
Retirement date2017-12-01
EIA plant ID#820

Grid hookup & remediation

Nearest substation0.2 mi
Operator address1230A Thousand Springs Grade, Wendell, ID, 83355
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Gooding County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)5,686
Construction employment356
Land value$7,101/acre
Datacenter tax incentiveproperty_tax_exemption

Power economics & interconnection

Commercial power rate9.15¢/kWh
Industrial power rate8.15¢/kWh
Load growth (FERC-714)1.2%

Water & cooling

Water stressMedium-High
Public water supply3.6 MGD
Industrial water use2.6 MGD
Cooling degree days500
Mean annual temp44°F

Hazard, flood & connectivity

FEMA risk index15.0 · Relatively Low
Fiber providers3 · 18% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Thousand Springs

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Thousand Springs, ranked by DC Readiness.

Candidate sites near Thousand Springs
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ Twin FallsGreenfieldIDTwin Falls——2.0 yrs60.0
UNKNOWN204860Substation-AdjacentIDGooding County230 kV300 MW6.9 yrs58.3
Greenfield (HEMINGWAY - MIDPOINT (500KV))GreenfieldIDGooding County500 kV1,000 MW6.9 yrs56.3
JEROMESubstation-AdjacentIDJerome County138 kV100 MW6.9 yrs55.8
TAP207316Substation-AdjacentIDJerome County138 kV100 MW6.9 yrs55.8
UNKNOWN205054Substation-AdjacentIDJerome County138 kV100 MW6.9 yrs55.8
EASTGATESubstation-AdjacentIDJerome County138 kV100 MW6.9 yrs55.8
TAP204826Substation-AdjacentIDJerome County138 kV100 MW6.9 yrs55.8

See all datacenter sites in Idaho →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Thousand Springs, Wendell, Gooding, Idaho. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.