Bennett Mountain

Brownfield

Mountain Home, Elmore, Idaho · Idaho Power Co

Legacy capacity
220
MW

Bennett Mountain is a natural gas plant in Mountain Home, Elmore, Idaho. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 220 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity220 MW
EIA plant ID#55733

Grid hookup & remediation

Nearest substation0.0 mi
OperatorIdaho Power Co
Operator address2750 NE Industrial Way, Mountain Home, ID, 83647
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Bennett Mountain, ranked by DC Readiness.

Candidate sites near Bennett Mountain
SiteTypeStateCountyVoltageCapacityQueue waitScore
BENNETT MOUNTAINSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs71.9
EVANDER ANDREWS POWER COMPLEXSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs70.9
RYEGRASS WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs69.8
UNKNOWN205044Substation-AdjacentIDElmore County230 kV300 MW2.0 yrs69.5
COLD SPRINGS WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs68.5
HAMMETT HILL WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs68.3
UNKNOWN205041Substation-AdjacentIDGooding County230 kV300 MW2.0 yrs68.0
MAINLINE WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs68.0

Nearby internet exchanges

See all datacenter sites in Idaho

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.