Rogers Road Landfill
BrownfieldNorwich, Connecticut
Rogers Road Landfill is a former landfill site in Norwich, Connecticut. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Rogers Road Landfill — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| North Main Street | oil plant | 19 | 2.0 mi | — |
| Subase Microgrid Project | natural gas plant | 13 | 10.3 mi | — |
| Pfizer Groton Plant | natural gas plant | 5 | 15.1 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Rogers Road Landfill
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Rogers Road Landfill, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN135915 | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 66.2 |
| MONTVILLE | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 66.0 |
| CARD` | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 63.6 |
| HADDAM | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 345 kV | 600 MW | 3.9 yrs | 63.6 |
| KILLINGLY | Substation-Adjacent | CT | Northeastern Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 63.5 |
| WILLIAMS ST | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 115 kV | 100 MW | 3.9 yrs | 61.0 |
| OZ Washington | Greenfield | RI | Washington | — | — | 3.5 yrs | 60.0 |
| BUDDINGTON | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 115 kV | 100 MW | 3.9 yrs | 59.9 |
Nearby internet exchanges
- Lightboard ★ MassachusettsSpringfield, MA · 7 networks
- Crown Castle Springfield (1 Federal)Springfield, MA · 4 networks
- Lightboard ★ New EnglandSpringfield, MA · 2 networks
- Lumen New LondonNew London, CT · 1 networks
See all datacenter sites in Connecticut →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Rogers Road Landfill, Norwich, Connecticut. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.