Tacoma

Brownfield

Durango, La Plata, Colorado · Public Service Co of Colorado

Legacy capacity
4
MW

Tacoma is a former hydro site in Durango, La Plata, Colorado, retired 2007-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 4 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity4 MW
Retirement date2007-12-01
EIA plant ID#6206

Grid hookup & remediation

Nearest substation0.0 mi
OperatorPublic Service Co of Colorado
Operator address#240 Electra Lake East, Durango, CO, 81301
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Tacoma, ranked by DC Readiness.

Candidate sites near Tacoma
SiteTypeStateCountyVoltageCapacityQueue waitScore
HESPERUSSubstation-AdjacentCOLa Plata County345 kV600 MW1.7 yrs65.9
BURRO BRIDGESubstation-AdjacentCOSan Juan County138 kV100 MW1.7 yrs62.6
TAP203985Substation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs62.5
UNKNOWN205925Substation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs61.1
UNKNOWN203901Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.6
UNKNOWN202564Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.5
TAP208063Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.1
UNKNOWN203759Substation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs60.0

See all datacenter sites in Colorado

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Tacoma, Durango, La Plata, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.