Cameo

Brownfield

Palisade, Mesa, Colorado · Public Service Co of Colorado

Legacy capacity
75
MW

Cameo is a coal plant in Palisade, Mesa, Colorado, retired 2010-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 75 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity75 MW
Retirement date2010-12-01
EIA plant ID#468

Grid hookup & remediation

Nearest substation1.5 mi
Operator address4 mi E of Palisade on I-70, Palisade, CO, 81526
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Mesa County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)55,008
IT / tech employment73
Construction employment5,109
Land value$8,081/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate12.75¢/kWh
Industrial power rate9.98¢/kWh
Load growth (FERC-714)1.4%

Water & cooling

Water stressHigh
Public water supply17.5 MGD
Industrial water use1.7 MGD
Cooling degree days700
Mean annual temp46°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers11 · 52% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Cameo

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Cameo, ranked by DC Readiness.

Candidate sites near Cameo
SiteTypeStateCountyVoltageCapacityQueue waitScore
GRAND JUNCTIONSubstation-AdjacentCOMesa County345 kV600 MW6.9 yrs59.4
OZ MesaGreenfieldCOMesa——1.7 yrs59.2
EC Coal Mesa CountyGreenfieldCOMesa County——1.7 yrs58.9
OZ MesaGreenfieldCOMesa——1.7 yrs58.4
EC Coal Mesa CountyGreenfieldCOMesa County——1.7 yrs58.3
GRAND JUNCTION PSCSubstation-AdjacentCOMesa County230 kV300 MW6.9 yrs57.8
CAMEOSubstation-AdjacentCOMesa County230 kV300 MW6.9 yrs57.8
EC Coal Delta CountyGreenfieldCODelta County——1.7 yrs57.7

See all datacenter sites in Colorado →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Cameo, Palisade, Mesa, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.