Skip to content
Gridcensus

Belmar Mixed-Use Development

Brownfield

Lakewood, Colorado

Legacy capacity
2
MW

Belmar Mixed-Use Development is a former brownfield site in Lakewood, Colorado. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer brownfield site
Site typeepa_brownfield
Existing capacity2 MW
Acreage48 ac

Grid hookup & remediation

Nearest substation1.2 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former brownfield site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Belmar Mixed-Use Development — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Cherokeecoal plant42111.1 mi—
Arapahoecoal plant2416.4 mi—
Valmontcoal plant19222.7 mi—
Zuninatural gas plant1156.0 mi—
Boulder Canyon Hydroformer hydro site2024.1 mi—
Front Range Projectnatural gas plant223.7 mi—
Aurora/Arapahoe Solar Arrayformer brownfield site121.1 micleanup_complete
Boulder Cowdery Meadows Solar Arrayformer landfill site123.6 micleanup_complete

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Belmar Mixed-Use Development

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Belmar Mixed-Use Development, ranked by DC Readiness.

Candidate sites near Belmar Mixed-Use Development
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHEROKEESubstation-AdjacentCODenver County230 kV300 MW6.9 yrs68.6
UNDERGROUND TAPSubstation-AdjacentCODenver County230 kV300 MW6.9 yrs66.2
ARAPAHOESubstation-AdjacentCODenver County230 kV300 MW6.9 yrs66.1
EC Near ZuniGreenfieldCODenver——1.7 yrs65.9
TOWERSubstation-AdjacentCODenver County230 kV300 MW6.9 yrs65.9
LACOMBESubstation-AdjacentCODenver County230 kV300 MW6.9 yrs65.9
ELATISubstation-AdjacentCODenver County230 kV300 MW6.9 yrs65.9
PICADILLYSubstation-AdjacentCODenver County230 kV300 MW6.9 yrs65.8

Nearby internet exchanges

See all datacenter sites in Colorado →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Belmar Mixed-Use Development, Lakewood, Colorado. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.