3 MW LLC
BrownfieldSomerset, Gunnison, Colorado · 3 MW LLC
3 MW LLC is a natural gas plant in Somerset, Gunnison, Colorado, retired 2023-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near 3 MW LLC, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| JUANITA | Substation-Adjacent | CO | Delta County | 115 kV | 100 MW | 1.7 yrs | 61.5 |
| UNKNOWN203749 | Substation-Adjacent | CO | Delta County | 115 kV | 100 MW | 1.7 yrs | 61.2 |
| TAP205179 | Substation-Adjacent | CO | Delta County | 115 kV | 100 MW | 1.7 yrs | 61.1 |
| Greenfield (RIFLE PSCO - CURECANTI) | Greenfield | CO | Delta County | 230 kV | 300 MW | 1.7 yrs | 60.6 |
| HOTCHKISS | Substation-Adjacent | CO | Delta County | 138 kV | 100 MW | 1.7 yrs | 60.1 |
| Greenfield (RIFLE PSCO - CURECANTI) | Greenfield | CO | Delta County | 230 kV | 300 MW | 1.7 yrs | 59.5 |
| UNKNOWN206914 | Substation-Adjacent | CO | Delta County | 138 kV | 100 MW | 1.7 yrs | 58.3 |
| Greenfield (RIFLE PSCO - CURECANTI) | Greenfield | CO | Delta County | 230 kV | 300 MW | 1.7 yrs | 58.0 |
See all datacenter sites in Colorado →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.