Robert E Ritchie

Brownfield

Helena, Phillips, Arkansas · Entergy Arkansas LLC

Legacy capacity
923
MW

Robert E Ritchie is a natural gas plant in Helena, Phillips, Arkansas, retired 2013-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 923 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity923 MW
Retirement date2013-11-01
EIA plant ID#173

Grid hookup & remediation

Nearest substation0.6 mi
OperatorEntergy Arkansas LLC
Operator addressHwy. 20, PO Box 388, Helena, AR, 72342
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Robert E Ritchie, ranked by DC Readiness.

Candidate sites near Robert E Ritchie
SiteTypeStateCountyVoltageCapacityQueue waitScore
CROSSROADS ENERGY CENTERSubstation-AdjacentMSCoahoma County230 kV300 MW1.4 yrs67.0
BANKSSubstation-AdjacentMSDeSoto County115 kV100 MW1.4 yrs66.0
UNKNOWN111260Substation-AdjacentMSQuitman County230 kV300 MW1.4 yrs64.8
UNKNOWN111259Substation-AdjacentMSCoahoma County115 kV100 MW1.4 yrs64.5
UNKNOWN117272Substation-AdjacentARPhillips County230 kV300 MW1.4 yrs64.5
TAP150099Substation-AdjacentMSCoahoma County115 kV100 MW1.4 yrs64.3
UNKNOWN111252Substation-AdjacentMSCoahoma County115 kV100 MW1.4 yrs63.9
TAP149969Substation-AdjacentARPhillips County230 kV300 MW1.4 yrs63.3

Nearby internet exchanges

See all datacenter sites in Arkansas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Robert E Ritchie, Helena, Phillips, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.