Skip to content
Gridcensus

Lake Catherine

Brownfield

Jones Mill, Hot Spring, Arkansas · Entergy Arkansas LLC

Legacy capacity
200
MW

Lake Catherine is a natural gas plant in Jones Mill, Hot Spring, Arkansas, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 200 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity200 MW
Retirement date2013-12-01
EIA plant ID#170

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressHwy. 270, PO Box 218, Jones Mill, AR, 72105
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Hot Spring County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)6,194
Construction employment204
Land value$3,629/acre

Power economics & interconnection

Commercial power rate12.25¢/kWh
Industrial power rate6.98¢/kWh
Load growth (FERC-714)0.8%

Water & cooling

Water stressLow
Public water supply2.3 MGD
Industrial water use0.0 MGD
Cooling degree days1,900
Mean annual temp60°F

Hazard, flood & connectivity

FEMA risk index38.0 · Relatively High
Fiber providers4 · 79% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Lake Catherine — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Hot Spring Generating Facilitynatural gas plant7159.7 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Lake Catherine

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Lake Catherine, ranked by DC Readiness.

Candidate sites near Lake Catherine
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117209Substation-AdjacentARHot Spring County500 kV1,000 MW2.8 yrs65.2
UNKNOWN117262Substation-AdjacentARHot Spring County500 kV1,000 MW2.8 yrs61.1
TAP149964Substation-AdjacentARHot Spring County500 kV1,000 MW2.8 yrs61.1
EC Near Lake CatherineGreenfieldARHot Spring——1.4 yrs57.5
EC Near Hot Spring Generating FacilityGreenfieldARHot Spring——1.4 yrs56.3
BAUXITESubstation-AdjacentARSaline County115 kV100 MW2.8 yrs55.5
UNKNOWN122820Substation-AdjacentARSaline County115 kV100 MW2.8 yrs55.5
UNKNOWN107797Substation-AdjacentARSaline County115 kV100 MW2.8 yrs55.5

Nearby internet exchanges

See all datacenter sites in Arkansas →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Lake Catherine, Jones Mill, Hot Spring, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.