Harvey Couch

Brownfield

Stamps, Lafayette, Arkansas · Entergy Arkansas LLC

Legacy capacity
183
MW

Harvey Couch is a natural gas plant in Stamps, Lafayette, Arkansas, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 183 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity183 MW
Retirement date2013-12-01
EIA plant ID#169

Grid hookup & remediation

Nearest substation0.0 mi
Operator addressHwy. 82 East, PO box 187, Stamps, AR, 71860
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Lafayette County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)677
Construction employment58
Land value$2,940/acre

Power economics & interconnection

Commercial power rate10.95¢/kWh
Industrial power rate7.01¢/kWh
Load growth (FERC-714)0.8%

Water & cooling

Water stressLow
Public water supply0.4 MGD
Industrial water use0.0 MGD
Cooling degree days1,900
Mean annual temp60°F

Hazard, flood & connectivity

FEMA risk index38.0 · Relatively High
Fiber providers6 · 79% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Harvey Couch

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Harvey Couch, ranked by DC Readiness.

Candidate sites near Harvey Couch
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN123543Substation-AdjacentARHempstead County345 kV600 MW2.8 yrs64.7
UNKNOWN107970Substation-AdjacentARColumbia County500 kV1,000 MW2.8 yrs63.2
EC FFE Hempstead CountyGreenfieldARHempstead County——1.4 yrs62.5
TAP171990Substation-AdjacentARHempstead County115 kV100 MW2.8 yrs60.5
WESTSubstation-AdjacentARHempstead County115 kV100 MW2.8 yrs60.4
EC Near Harvey CouchGreenfieldARLafayette——1.4 yrs60.4
TAP150157Substation-AdjacentARHempstead County115 kV100 MW2.8 yrs60.2
OZ WebsterGreenfieldLAWebster——1.4 yrs59.2

Nearby internet exchanges

See all datacenter sites in Arkansas →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Harvey Couch, Stamps, Lafayette, Arkansas. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.