Valdez

Brownfield

Valdez, Valdez Cordova, Alaska · Copper Valley Elec Assn, Inc

Legacy capacity
3
MW

Valdez is a oil plant in Valdez, Valdez Cordova, Alaska, retired 2018-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity3 MW
Retirement date2018-01-01
EIA plant ID#6306

Grid hookup & remediation

Nearest substation0.0 mi
Operator address527 West Egan, Valdez, AK, 99686
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Get alerts

Track Valdez

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Valdez, ranked by DC Readiness.

Candidate sites near Valdez
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHUGACH NATIONAL FORESTFederal ExcessAKChugach County——1.0 yrs54.0
Mine SiteFormer MineAKChugach County——3.5 yrs51.7
Mine SiteFormer MineAKChugach County——3.5 yrs51.7
Mine SiteFormer MineAKChugach County——3.5 yrs51.6
Mine SiteFormer MineAKChugach County——3.5 yrs50.1
Mine SiteFormer MineAKChugach County——3.5 yrs48.0
Mine SiteFormer MineAKChugach County——3.5 yrs47.7
ValdezBrownfieldAKChugach Census Area—3 MW3.5 yrs46.2

See all datacenter sites in Alaska →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Valdez, Valdez, Valdez Cordova, Alaska is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.