Chena Power Plant

Brownfield

Fairbanks, Fairbanks North Star, Alaska · Aurora Energy LLC

Legacy capacity
4
MW

Chena Power Plant is a coal plant in Fairbanks, Fairbanks North Star, Alaska, retired 2009-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 4 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity4 MW
Retirement date2009-08-01
EIA plant ID#79

Grid hookup & remediation

Nearest substation3.1 mi
OperatorAurora Energy LLC
Operator address1206 First Ave., Fairbanks, AK, 99701
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Chena Power Plant, ranked by DC Readiness.

Candidate sites near Chena Power Plant
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN158551Substation-AdjacentAKFairbanks North Star Borough138 kV100 MW3.5 yrs62.7
UNKNOWN158464Substation-AdjacentAKFairbanks North Star Borough138 kV100 MW3.5 yrs61.9
UNKNOWN158474Substation-AdjacentAKFairbanks North Star Borough138 kV100 MW3.5 yrs61.4
UNKNOWN158489Substation-AdjacentAKFairbanks North Star Borough138 kV100 MW3.5 yrs61.1
NORTH POLESubstation-AdjacentAKFairbanks North Star Borough138 kV100 MW3.5 yrs60.6
UNKNOWN158550Substation-AdjacentAKFairbanks North Star Borough138 kV100 MW3.5 yrs60.5
Chena Power PlantBrownfieldAKFairbanks North Star Borough4 MW3.5 yrs55.6
FAIRBANKSFederal ExcessAKFairbanks North Star County51.6

Nearby internet exchanges

See all datacenter sites in Alaska

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Chena Power Plant, Fairbanks, Fairbanks North Star, Alaska. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.