Centennial

Brownfield

Metlakatla, Prince of Wales Ketchikan, Alaska · Metlakatla Power & Light

Legacy capacity
3
MW

Centennial is a oil plant in Metlakatla, Prince of Wales Ketchikan, Alaska, retired 2022-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity3 MW
Retirement date2022-12-01
EIA plant ID#7112

Grid hookup & remediation

Nearest substation35.1 mi
OperatorMetlakatla Power & Light
Operator addressWalden Point Road, Metlakatla, AK, 99926
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Centennial, ranked by DC Readiness.

Candidate sites near Centennial
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ Prince of Wales-HyderGreenfieldAKPrince of Wales-Hyder3.5 yrs51.5
NDB DF ANNETTE ISLANDFederal ExcessAKPrince of Wales-Hyder County47.1
NWS WSO UAIB ANNETTE AK SITE 1 INSTALLATIONFederal ExcessAKPrince of Wales-Hyder County46.2
CentennialBrownfieldAKKetchikan Gateway Borough3 MW3.5 yrs45.5
Hangar PropertyIndustrialAKPrince of Wales-Hyder County43.0
Site 76 Standard Oil FacilityIndustrialAKPrince of Wales-Hyder County43.0
Log Storage AreaIndustrialAKPrince of Wales-Hyder County42.9
Revetment Vehicle DumpIndustrialAKPrince of Wales-Hyder County42.9

See all datacenter sites in Alaska

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.