Yellowhammer Gas Plant
BrownfieldCoden, MOBILE, Alabama · W&T Offshore Inc
Yellowhammer Gas Plant is a natural gas plant in Coden, MOBILE, Alabama, retired 2021-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Mobile County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Yellowhammer Gas Plant
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Yellowhammer Gas Plant, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BIG CREEK | Substation-Adjacent | AL | Mobile County | 500 kV | 1,000 MW | 1.0 yrs | 68.3 |
| CHICKASAW | Substation-Adjacent | AL | Mobile County | 230 kV | 300 MW | 1.0 yrs | 64.4 |
| THEODORE | Substation-Adjacent | AL | Mobile County | 230 kV | 300 MW | 1.0 yrs | 64.4 |
| NORTH MOBILE | Substation-Adjacent | AL | Mobile County | 230 kV | 300 MW | 1.0 yrs | 64.1 |
| SILVERHILL | Substation-Adjacent | AL | Baldwin County | 230 kV | 300 MW | 1.0 yrs | 63.0 |
| OZ Mobile | Greenfield | AL | Mobile | — | — | 3.7 yrs | 61.9 |
| EC Near Yellowhammer Gas Plant | Greenfield | AL | MOBILE | — | — | 3.7 yrs | 61.0 |
| OZ Mobile | Greenfield | AL | Mobile | — | — | 3.7 yrs | 60.8 |
See all datacenter sites in Alabama →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Yellowhammer Gas Plant, Coden, MOBILE, Alabama. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.