Lowman Energy Center

Brownfield

Leroy, Washington, Alabama · PowerSouth Energy Cooperative

Legacy capacity
538
MW

Lowman Energy Center is a coal plant in Leroy, Washington, Alabama, retired 2020-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 538 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity538 MW
Retirement date2020-10-01
EIA plant ID#56

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressCarson Road, Leroy, AL, 36548
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Washington County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)5,188
Construction employment177
Land value$2,714/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate14.25¢/kWh
Industrial power rate11.10¢/kWh
Load growth (FERC-714)1.1%

Water & cooling

Water stressLow
Public water supply2.8 MGD
Industrial water use9.3 MGD
Cooling degree days2,100
Mean annual temp63°F

Hazard, flood & connectivity

FEMA risk index45.0 · Relatively High
Fiber providers6 · 46% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Lowman Energy Center

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Lowman Energy Center, ranked by DC Readiness.

Candidate sites near Lowman Energy Center
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109067Substation-AdjacentALClarke County230 kV300 MW1.0 yrs63.9
WEST MCINTOSH (POWERSOUTH)Substation-AdjacentALWashington County230 kV300 MW1.0 yrs63.3
WEST MCINTOSHSubstation-AdjacentALWashington County230 kV300 MW1.0 yrs63.3
CHATOMSubstation-AdjacentALWashington County230 kV300 MW1.0 yrs63.2
UNKNOWN109319Substation-AdjacentALWashington County230 kV300 MW1.0 yrs63.0
UNKNOWN109062Substation-AdjacentALWashington County230 kV300 MW1.0 yrs63.0
UNKNOWN109320Substation-AdjacentALWashington County230 kV300 MW1.0 yrs62.9
UNKNOWN109065Substation-AdjacentALWashington County230 kV300 MW1.0 yrs62.9

See all datacenter sites in Alabama →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Lowman Energy Center, Leroy, Washington, Alabama is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.