H Allen Franklin Combined Cycle
BrownfieldSmiths, Lee, Alabama · Southern Power Co
H Allen Franklin Combined Cycle is a natural gas plant in Smiths, Lee, Alabama. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 688 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Lee County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near H Allen Franklin Combined Cycle — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Goat Rock | former hydro site | 6 | 1.1 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track H Allen Franklin Combined Cycle
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near H Allen Franklin Combined Cycle, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FORTSON | Substation-Adjacent | GA | Muscogee County | 500 kV | 1,000 MW | 1.0 yrs | 72.6 |
| UNKNOWN109844 | Substation-Adjacent | AL | Lee County | 230 kV | 300 MW | 1.0 yrs | 69.1 |
| UNKNOWN109347 | Substation-Adjacent | AL | Harris County | 230 kV | 300 MW | 1.0 yrs | 68.8 |
| UNKNOWN113439 | Substation-Adjacent | GA | Muscogee County | 230 kV | 300 MW | 1.0 yrs | 68.5 |
| UNKNOWN113436 | Substation-Adjacent | GA | Muscogee County | 230 kV | 300 MW | 1.0 yrs | 68.5 |
| UNKNOWN109349 | Substation-Adjacent | AL | Lee County | 230 kV | 300 MW | 1.0 yrs | 68.1 |
| UNKNOWN109353 | Substation-Adjacent | AL | Lee County | 230 kV | 300 MW | 1.0 yrs | 68.0 |
| TAP142593 | Substation-Adjacent | GA | Muscogee County | 230 kV | 300 MW | 1.0 yrs | 68.0 |
Nearby internet exchanges
- AUBix AuburnAuburn, AL · 12 networks
- DLI OneColumbus, GA · 2 networks
See all datacenter sites in Alabama →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.