Skip to content
Gridcensus

Barry

Brownfield

Bucks, Mobile, Alabama · Alabama Power Co

Legacy capacity
272
MW

Barry is a coal plant in Bucks, Mobile, Alabama, retired 2015-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 272 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity272 MW
Retirement date2015-08-01
EIA plant ID#3

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressNorth Highway 43, Bucks, AL, 36512
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Mobile County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)147,490
IT / tech employment165
Construction employment11,546
Land value$4,768/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate14.38¢/kWh
Industrial power rate8.18¢/kWh
Load growth (FERC-714)1.1%

Water & cooling

Water stressLow
Public water supply66.1 MGD
Industrial water use10.1 MGD
Cooling degree days2,100
Mean annual temp63°F

Hazard, flood & connectivity

FEMA risk index45.0 · Relatively High
Fiber providers11 · 68% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Barry

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Barry, ranked by DC Readiness.

Candidate sites near Barry
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109061Substation-AdjacentALMobile County500 kV1,000 MW1.0 yrs68.8
BIG CREEKSubstation-AdjacentALMobile County500 kV1,000 MW1.0 yrs68.3
UNKNOWN109058Substation-AdjacentALMobile County230 kV300 MW1.0 yrs64.8
UNKNOWN109076Substation-AdjacentALMobile County230 kV300 MW1.0 yrs64.4
CHICKASAWSubstation-AdjacentALMobile County230 kV300 MW1.0 yrs64.4
UNKNOWN109130Substation-AdjacentALMobile County230 kV300 MW1.0 yrs64.4
UNKNOWN109059Substation-AdjacentALMobile County230 kV300 MW1.0 yrs64.3
NORTH MOBILESubstation-AdjacentALMobile County230 kV300 MW1.0 yrs64.1

See all datacenter sites in Alabama →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Barry, Bucks, Mobile, Alabama. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.