STONEWALL

Substation

West Virginia · THE POTOMAC EDISON CO

Max voltage
138
kV

STONEWALL is an electric transmission substation in West Virginia, operated by THE POTOMAC EDISON CO. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorTHE POTOMAC EDISON CO
Coordinates39.2822, -78.1203

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5931138 kVTHE POTOMAC EDISON COIN SERVICE11.4 mi
#20281138 kVTHE POTOMAC EDISON COIN SERVICE7.9 mi
#21101138 kVIN SERVICE2.1 mi
#45892138 kVTHE POTOMAC EDISON COIN SERVICE21.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of STONEWALL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near STONEWALL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOSBYSubstation-AdjacentVAWinchester city500 kV1,000 MW3.0 yrs78.7
FRONT ROYALSubstation-AdjacentVAWarren County500 kV1,000 MW3.0 yrs78.2
NEW CREEK WINDSubstation-AdjacentVAFrederick County500 kV1,000 MW3.0 yrs73.2
BEDINGTONSubstation-AdjacentWVBerkeley County500 kV1,000 MW3.0 yrs71.8
MIDDLEBURGSubstation-AdjacentVALoudoun County115 kV100 MW3.0 yrs70.6
MEADOW BROOKSubstation-AdjacentVAFrederick County500 kV1,000 MW3.0 yrs70.2
UNKNOWN121557Substation-AdjacentVAWinchester city138 kV100 MW3.0 yrs70.1
Greenfield (MOUNT STORM - MEADOW BROOK)GreenfieldVAFrederick County500 kV1,000 MW3.0 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for STONEWALL substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.