BLACK OAK is an electric transmission substation in West Virginia, operated by THE POTOMAC EDISON CO. It is classified as extra-high-voltage (500 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage138 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines5

Ownership & operation

OperatorTHE POTOMAC EDISON CO
Co-ownerTHE POTOMAC EDISON COMPANY
Coordinates39.5030, -78.7163

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#33174500 kVTHE POTOMAC EDISON COMPANYIN SERVICE61.3 mi
#48576500 kVTHE POTOMAC EDISON COIN SERVICE60.1 mi
#19916138 kVTHE POTOMAC EDISON COIN SERVICE8.7 mi
#31050138 kVTHE POTOMAC EDISON COIN SERVICE18.8 mi
#34206138 kVTHE POTOMAC EDISON COIN SERVICE8.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BLACK OAK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BLACK OAK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEW CREEK WINDSubstation-AdjacentVAFrederick County500 kV1,000 MW3.0 yrs73.2
DOUBSSubstation-AdjacentWVHampshire County500 kV1,000 MW3.0 yrs72.8
BLACK OAKSubstation-AdjacentMDAllegany County500 kV1,000 MW3.0 yrs71.9
Greenfield (MOUNT STORM - MEADOW BROOK)GreenfieldVAFrederick County500 kV1,000 MW3.0 yrs69.9
Greenfield (DOUBS - NEW CREEK WIND)GreenfieldWVHampshire County500 kV1,000 MW3.0 yrs69.4
Greenfield (BLACK OAK - BEDINGTON)GreenfieldWVHampshire County500 kV1,000 MW3.0 yrs68.7
Greenfield (MOUNT STORM - MEADOW BROOK)GreenfieldWVHampshire County500 kV1,000 MW3.0 yrs68.6
Greenfield (DOUBS - NEW CREEK WIND)GreenfieldWVHampshire County500 kV1,000 MW3.0 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BLACK OAK substation, West Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.