SOLLERS WARF is an electric transmission substation in Virginia, operated by BALTIMORE GAS & ELECTRIC CO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorBALTIMORE GAS & ELECTRIC CO
Coordinates38.3471, -76.4724

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#38197230 kVBALTIMORE GAS & ELECTRIC COIN SERVICE12.7 mi
#38234230 kVBALTIMORE GAS & ELECTRIC COIN SERVICE11.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SOLLERS WARF, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SOLLERS WARF substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN162181Substation-AdjacentMDPrince George's County500 kV1,000 MW3.1 yrs78.3
UNKNOWN162182Substation-AdjacentMDPrince George's County500 kV1,000 MW3.1 yrs77.6
BRANDYWINE POWER FACILITYSubstation-AdjacentMDPrince George's County230 kV300 MW3.1 yrs73.7
CALVERT CLIFFSSubstation-AdjacentMDCalvert County500 kV1,000 MW3.1 yrs71.5
Greenfield (CHALK POINT - UNKNOWN162181)GreenfieldMDPrince George's County500 kV1,000 MW3.1 yrs70.4
TALBERT TAPSubstation-AdjacentMDPrince George's County230 kV300 MW3.1 yrs70.2
CHALK POINTSubstation-AdjacentMDCalvert County500 kV1,000 MW3.1 yrs67.6
HOLLAND CLIFFSubstation-AdjacentMDCalvert County230 kV300 MW3.1 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SOLLERS WARF substation, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.