BRANDYWINE POWER FACILITY

Substation-Adjacent

Prince George's County, Maryland · PJM

DC Readiness
73.7
Excellent / 100

BRANDYWINE POWER FACILITY is a substation-adjacent datacenter candidate site in Prince George's County, Maryland, interconnecting through PJM. It screens at 73.7/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBRANDYWINE POWER FACILITY
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPAiNET DC-900S
IXP distance15.5 mi
Fiber providers9
Fiber coverage96.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance40.8 mi

Site characteristics

Parcel ownerPOTOMAC ELECTRIC POWER CO
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteGWYNN PARK HIGH
Hazard sub-score68/100
Construction cost index107.9 (avg 100)

Location context

Nearest datacenterQTS Suitland
DC distance10.5 mi
Nearest rail1.3 mi
Nearest gas pipeline7.3 mi
Nearest fiber route6.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity9.86¢/kWh
Industrial electricity11.45¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$9,684

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
39
Fiber connectivity12%
87
Energy cost10%
95
Water risk8%
86
Natural hazard8%
68
Buildability7%
90
Labor market4%
50
DC cluster4%
90
Land / acreage3%
54
Construction cost3%
60
Gas pipeline2%
76
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Prince George's County, ranked by DC Readiness.

Sites near BRANDYWINE POWER FACILITY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN162181Substation-Adjacent500 kV1,000 MW3.1 yrs78.3
UNKNOWN162182Substation-Adjacent500 kV1,000 MW3.1 yrs77.6
OAK GROVESubstation-Adjacent230 kV300 MW3.1 yrs73.3
BUENA VISTASubstation-Adjacent230 kV300 MW3.1 yrs73.1
RITCHIESubstation-Adjacent230 kV300 MW3.1 yrs71.5
BOWIESubstation-Adjacent230 kV300 MW3.1 yrs71.3
Greenfield (CHALK POINT - UNKNOWN162181)Greenfield500 kV1,000 MW3.1 yrs70.4
PALMERS CORNERSubstation-Adjacent230 kV300 MW3.1 yrs70.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.