TAP209083

Substation

Oregon · NORTHERN WASCO COUNTY PUD

Max voltage
230
kV

TAP209083 is an electric transmission substation in Oregon, operated by NORTHERN WASCO COUNTY PUD. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
StateOregon
Coordinates45.6347, -121.2040

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77613230 kVNORTHERN WASCO COUNTY PUD0.2 mi
#77617230 kVNORTHERN WASCO COUNTY PUD0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209083, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209083 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CELILOSubstation-AdjacentWAKlickitat County1000 kV1,000 MW5.8 yrs74.3
UNKNOWN209081Substation-AdjacentORHood River County230 kV300 MW1.7 yrs71.7
BIG EDDYSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.2
THE DALLESSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs69.2
WINDY FLATS WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs68.4
Greenfield (WAUTOMA - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs68.0
UNKNOWN201419Substation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs67.5
Greenfield (JOHN DAY 2 - BIG EDDY)GreenfieldWAKlickitat County500 kV1,000 MW1.7 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209083 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.