WINDY FLATS WIND PROJECT

Substation-Adjacent

Klickitat County, Washington · WECC

DC Readiness
68.4
Good / 100

WINDY FLATS WIND PROJECT is a substation-adjacent datacenter candidate site in Klickitat County, Washington, interconnecting through WECC. It screens at 68.4/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWINDY FLATS WIND PROJECT
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPYAKMWAFP - Wholesail Yakima
IXP distance63.4 mi
Fiber providers5
Fiber coverage13.7%
Nearest cloud providerAWS
Nearest cloud regionus-west-2
Cloud region distance64.5 mi

Site characteristics

Parcel ownerPUD NO 1 OF KLICKITAT COUNTY
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index64.9 (avg 100)

Location context

Nearest datacenterGoogle The Dalles 2
DC distance18.7 mi
Nearest rail2.1 mi
Nearest gas pipeline3.7 mi
Nearest fiber route78.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.42¢/kWh
Industrial electricity6.59¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$2,482

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
33
Fiber connectivity12%
53
Energy cost10%
94
Water risk8%
73
Natural hazard8%
72
Buildability7%
80
Labor market4%
50
DC cluster4%
70
Land / acreage3%
48
Construction cost3%
96
Gas pipeline2%
88
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Klickitat County, ranked by DC Readiness.

Sites near WINDY FLATS WIND PROJECT
SiteTypeVoltageCapacityQueue waitScore
CELILOSubstation-Adjacent1000 kV1,000 MW5.8 yrs74.3
ROCK CREEKSubstation-Adjacent500 kV1,000 MW1.7 yrs70.8
JOHN DAY 1Substation-Adjacent500 kV1,000 MW1.7 yrs70.5
BIG EDDYSubstation-Adjacent500 kV1,000 MW1.7 yrs70.2
THE DALLESSubstation-Adjacent230 kV300 MW1.7 yrs69.2
TUOLUMNE WIND PROJECTSubstation-Adjacent230 kV300 MW1.7 yrs68.7
TAP209123Substation-Adjacent345 kV600 MW1.7 yrs68.5
JOHN DAYSubstation-Adjacent500 kV1,000 MW1.7 yrs68.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINDY FLATS WIND PROJECT, Klickitat County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.