TAP205753

Substation

Oregon · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP205753 is an electric transmission substation in Oregon, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
StateOregon
Coordinates45.4534, -121.1317

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77603115 kVNORTHERN WASCO COUNTY PUD0.4 mi
#77604115 kVNORTHERN WASCO COUNTY PUD0.0 mi
#77605115 kVNORTHERN WASCO COUNTY PUD3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205753, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205753 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CELILOSubstation-AdjacentWAKlickitat County1000 kV1,000 MW5.8 yrs74.3
BUCKLEYSubstation-AdjacentORWasco County500 kV1,000 MW1.7 yrs72.0
UNKNOWN209081Substation-AdjacentORHood River County230 kV300 MW1.7 yrs71.7
JOHN DAY 1Substation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.5
BIG EDDYSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.2
THE DALLESSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs69.2
WINDY FLATS WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs68.4
Greenfield (WAUTOMA - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205753 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.