JOHN DAY 1

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

JOHN DAY 1 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates45.6757, -120.7359

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67483500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE0.2 mi
#67484230 kVBONNEVILLE POWER ADMINISTRATION6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JOHN DAY 1, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JOHN DAY 1 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CELILOSubstation-AdjacentWAKlickitat County1000 kV1,000 MW5.8 yrs74.3
ROCK CREEKSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.8
JOHN DAY 1Substation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.5
BIG EDDYSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.2
TUOLUMNE WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs68.7
WINDY FLATS WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs68.4
JOHN DAYSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs68.1
LINDEN WIND ENERGY PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JOHN DAY 1 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.