BIGLOW CANYON WIND FARM

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

BIGLOW CANYON WIND FARM is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates45.6514, -120.6039

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73211230 kVBONNEVILLE POWER ADMINISTRATION0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIGLOW CANYON WIND FARM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIGLOW CANYON WIND FARM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROCK CREEKSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.8
JOHN DAY 1Substation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.5
TUOLUMNE WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs68.7
TAP209123Substation-AdjacentWAKlickitat County345 kV600 MW1.7 yrs68.5
WINDY FLATS WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs68.4
JOHN DAYSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs68.1
ARLINGTON WIND POWER PROJECTSubstation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.8
JUNIPER CANYON I WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BIGLOW CANYON WIND FARM substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.