TAP154705
SubstationMissouri · UNION ELECTRIC CO - (MO)
TAP154705 is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #7974 | 345 kV | — | IN SERVICE | 0.2 mi |
| #29169 | 345 kV | UNION ELECTRIC CO - (MO) | IN SERVICE | 24.6 mi |
| #42091 | 345 kV | UNION ELECTRIC CO - (MO) | IN SERVICE | 4.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP154705, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ESSEX | Substation-Adjacent | MO | Stoddard County | 345 kV | 600 MW | 1.4 yrs | 70.3 |
| TAP154705 | Substation-Adjacent | MO | Butler County | 345 kV | 600 MW | 1.4 yrs | 70.3 |
| UNKNOWN122781 | Substation-Adjacent | MO | Butler County | 345 kV | 600 MW | 4.6 yrs | 70.0 |
| TAP154742 | Substation-Adjacent | MO | New Madrid County | 345 kV | 600 MW | 1.4 yrs | 68.4 |
| UNKNOWN122826 | Substation-Adjacent | MO | Butler County | 161 kV | 100 MW | 1.4 yrs | 65.2 |
| Greenfield (WEST NEW MADRID - DELL) | Greenfield | MO | Pemiscot County | 500 kV | 1,000 MW | 1.4 yrs | 64.7 |
| UNKNOWN121102 | Substation-Adjacent | MO | Dunklin County | 161 kV | 100 MW | 1.4 yrs | 64.7 |
| ST FRANCIS ENERGY FACILITY | Substation-Adjacent | MO | Butler County | 345 kV | 600 MW | 1.4 yrs | 64.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP154705 substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.