ST FRANCIS ENERGY FACILITY

Substation-Adjacent

Butler County, Missouri · MISO

DC Readiness
64.6
Good / 100

ST FRANCIS ENERGY FACILITY is a substation-adjacent datacenter candidate site in Butler County, Missouri, interconnecting through MISO. It screens at 64.6/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationST FRANCIS ENERGY FACILITY
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance89.5 mi
Fiber providers5
Fiber coverage58.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance392.3 mi

Site characteristics

Parcel ownerUNION ELECTRIC CO - (MO)
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index72.5 (avg 100)

Location context

Nearest datacenterRiot Kentucky
DC distance89.1 mi
Nearest rail6.3 mi
Nearest gas pipeline3.5 mi
Nearest fiber route260.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.03¢/kWh
Industrial electricity8.66¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,085

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
48
Fiber connectivity12%
22
Energy cost10%
91
Water risk8%
88
Natural hazard8%
62
Buildability7%
65
Labor market4%
50
DC cluster4%
20
Land / acreage3%
47
Construction cost3%
90
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Butler County, ranked by DC Readiness.

Sites near ST FRANCIS ENERGY FACILITY
SiteTypeVoltageCapacityQueue waitScore
TAP154705Substation-Adjacent345 kV600 MW1.4 yrs70.3
UNKNOWN122781Substation-Adjacent345 kV600 MW4.6 yrs70.0
UNKNOWN122826Substation-Adjacent161 kV100 MW1.4 yrs65.2
UNKNOWN117703Substation-Adjacent161 kV100 MW1.4 yrs64.4
UNKNOWN117880Substation-Adjacent161 kV100 MW1.4 yrs64.1
UNKNOWN122784Substation-Adjacent161 kV100 MW1.4 yrs63.7
TAP154709Substation-Adjacent161 kV100 MW1.4 yrs63.7
UNKNOWN122784Substation-Adjacent161 kV100 MW4.6 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ST FRANCIS ENERGY FACILITY, Butler County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.