TAP153764

Substation

Missouri · EMPIRE DISTRICT ELECTRIC CO

Max voltage
161
kV

TAP153764 is an electric transmission substation in Missouri, operated by EMPIRE DISTRICT ELECTRIC CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorEMPIRE DISTRICT ELECTRIC CO
Coordinates36.9748, -93.9155

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#617161 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE0.1 mi
#5360161 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE11.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153764, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153764 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN107928 - BROOKLINE)GreenfieldMOGreene County345 kV600 MW3.4 yrs69.2
Greenfield (MORGAN - BROOKLINE)GreenfieldMOGreene County345 kV600 MW1.4 yrs67.5
Greenfield (UNKNOWN107928 - BROOKLINE)GreenfieldMOLawrence County345 kV600 MW3.4 yrs66.9
UNKNOWN117387Substation-AdjacentMOLawrence County161 kV100 MW1.4 yrs66.5
Greenfield (UNKNOWN107928 - BROOKLINE)GreenfieldMOLawrence County345 kV600 MW3.4 yrs66.5
Greenfield (UNKNOWN107928 - BROOKLINE)GreenfieldMOLawrence County345 kV600 MW3.4 yrs66.3
TAP153764Substation-AdjacentMOLawrence County161 kV100 MW1.4 yrs66.1
Greenfield (UNKNOWN107928 - BROOKLINE)GreenfieldMOMcDonald County345 kV600 MW3.4 yrs65.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153764 substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.